Morning Briefing: Data Centers

Friday, November 27, 2026

November 27, 2026

Building Up Doesn't Put Data Centers Above Local Review

Kansas City unanimously rejected a proposed 20-story downtown data center earlier this month, The New York Times reported yesterday. The project would have replaced a historic landmark near a school and commercial buildings; residents had submitted more than 400 opposition letters.

The decision adds a concrete outcome to an established picture of local restrictions. Building vertically may reduce a project’s land footprint, but it does not remove questions about neighborhood compatibility and preservation.

The Kansas City rejection is an actual project decision, not just opposition to a proposal. The reporting does not establish how much weight the council gave residents’ objections or what the developer will do next.

An earlier accounting of November’s ballot measures reinforces the breadth of local controls: voters approved restrictions or conditions in 40 of 41 selected contests across ten states, according to Global Policy Watch. These were not new votes yesterday, and the results range from bans to conditional pathways; Ohio accounted for 21 measures.

The Register reported that cooling vendors are designing liquid systems around 45°C inlet temperatures. For suitable new facilities, that could allow dry coolers to replace mechanical chillers. The potential savings remain vendor estimates, not demonstrated results across operating facilities.

Goldman Sachs estimates that emerging hyperscalers account for 6.3 GW of Broadcom’s estimated 10-GW FY2027 custom-chip deployment plan and about 75% of its 20-GW FY2028 target, according to Aol. Those forecasts depend in part on customers delivering funded facilities with land, power and building shells.

Key Points

  • Local risk is not confined to large suburban campuses. Kansas City’s vertical proposal encountered a different set of site-specific concerns, while the ballot results show that some existing approvals can also be reversed.
  • The Broadcom estimates make the physical dependency behind deployment forecasts more concrete. Recent reporting also showed that Nvidia capacity commitments can depend on financing and operational delivery; neither type of projection is equivalent to a completed facility.

Implications

Developers and financiers need to distinguish a prohibited site from one facing additional votes, zoning requirements or incentive conditions. The legal effect and timing of individual ballot measures remain unclear.

Warmer liquid cooling could improve power and water requirements for some new builds, but site-specific engineering is needed before those potential savings can inform facility sizing.

Watchpoints

Watch

Any redesign, appeal or alternative site after Kansas City’s rejection.

Watch

Implementation and legal challenges affecting individual ballot measures and existing project approvals.

Watch

Named 45°C cooling deployments with measured power and water performance.

Watch

Financing, utility service and construction milestones behind Broadcom-linked deployment plans.

Fallout

Local approvals remain the clearest demonstrated constraint in today’s reporting; cooling designs and chip deployment plans offer possibilities rather than completed capacity.

Local approvals and land use

Project feasibility depends on the rules and physical context of each site, even where a developer proposes a smaller footprint.

Fresh developments

New reporting disclosed Kansas City’s earlier rejection of a vertical project. The account of November ballot measures adds context but does not represent new voting.

Why we noticed

Some measures impose conditions rather than prohibitions, and some reversed earlier approvals. That distinction matters when assessing whether an entitlement remains usable.

Watch for:

  • The developer’s response to the Kansas City decision.
  • How individual ballot measures are implemented or challenged.

Cooling, power and water

Cooling design can affect the resources a facility needs alongside its computing equipment.

Fresh developments

The Register described vendor designs using 45°C liquid-cooling inlets, following an earlier Nvidia capability disclosure.

Why we noticed

Dry coolers could replace mechanical chillers at suitable new sites, but reported savings are estimates and existing facilities require engineering review.

Watch for:

  • Operating deployments and measured facility-level power and water savings.

Financing and infrastructure delivery

Chip deployment targets depend on customers’ ability to turn planned facilities into operating capacity.

Fresh developments

Aol reported Goldman Sachs estimates showing substantial emerging-hyperscaler participation in Broadcom’s FY2027 and FY2028 deployment plans.

Why we noticed

The estimates quantify exposure to facility readiness but do not establish a funding shortfall, a construction delay or secured utility service.

Watch for:

  • Site-level financing, power commitments and construction progress supporting the forecasts.

Final Thought

The practical distinction is between capacity that can be imagined and capacity that can be built: approval, engineering and financing each answer a different part of that question.